Testimonials | Home | Contact Us
1-800- 762-1815
 

PORTFOLIO...

  • Peddie School | Hightstown, NJ

    Peddie School | Hightstown, NJ

  • PSE&G Headquarters | Newark, NJ

    PSE&G Headquarters | Newark, NJ

  • New photo-voltaic solar panel system

    New photo-voltaic solar panel system

    In October 2011, JSC embraced “green technology” by installing a new photo-voltaic solar panel system. Between a 30% tax rebate, tax credits, SRECs and lower utility bills, JSC management felt the system was a “no-brainer”.

  • BRANCHBURG MUNICIPAL | Branchburg, NJ

    BRANCHBURG MUNICIPAL | Branchburg, NJ

    JSC was called on to not only reduce the runaway energy costs but to stabilize and improve comfort levels. After successfully winning the bid to install a BMS, JSC removed the conventional controls and installed a state-of-the art control system that offered flexibility and reli-ability. Schedules are preprogrammed for the courtroom so the HVAC systems only operate when needed and electronic reheat coils are staged to avoid spiking demand charges.

  • EDA Waterfront Technology | Camden, NJ

    EDA Waterfront Technology | Camden, NJ

  • Greater Egg Harbor High School

    Greater Egg Harbor High School

    This new High School was built on 60 acres of land which allowed the construction of a well field for a Ground Source Heat Pump System to satisfy the heating and cool-ing requirements of the building.

  • Harrison High School | Harrison, NJ

    Harrison High School | Harrison, NJ

    Contracted by Binsky & Snyder, Jersey State Controls installed an integrated Andover HVAC Control System. This new $53 million dollar facility with its state of the art remote utility plant, natatorium, mul-tiple gyms and advanced instructional areas requires a flexible con-trol platform that is capable of communicating with numerous third party manufacturers.

  • Newark Board of Education | Newark, NJ

    Newark Board of Education | Newark, NJ

    Energy Efficient HVAC Application: Rooftop Heat Recovery Units and water source Heat Pumps provide energy efficient HVAC operation. The Andover Controls (BACnet based system) allows scheduling, optimized warm – up, outside air reset and overall optimization of HVAC System contr

  • Stockton Campus Center | Stockton College

    Stockton Campus Center | Stockton College

  • JSCBMS Crew at Work!!

    JSCBMS Crew at Work!!

  • One of Many JSCBMS Work Trucks

    One of Many JSCBMS Work Trucks

  • Jersey State Controls Headquarters | Brick, NJ

    Jersey State Controls Headquarters | Brick, NJ

  • Brick Township Municipal Complex | Brick, NJ

    Brick Township Municipal Complex | Brick, NJ

    JSC was elated when they learned of their success at their very own Township Municipal Building. This job would not be without a few major challenges: An aggressive schedule combined with the ultimate challenge to minimally dis rupt the day to day activities of the Township. Minimize AHU, Chiller and Boiler Downtime New drives for fans and pumps, new DDC Controls to replace the 36 year old Barber Colman system and new tight sealing dampers on the AHU’s make up this $375,000 project due completed in November 2010.

  • Freehold High School | Freehold, NJ

    Freehold High School | Freehold, NJ

  • Edison High School | Edison, NJ

    Edison High School | Edison, NJ

  • William Woodruff School | Berkeley Heights, NJ

    William Woodruff School | Berkeley Heights, NJ

  • Mountain Park School | Berkeley Heights, NJ

    Mountain Park School | Berkeley Heights, NJ

  • Ocean Township High School | Ocean, NJ

    Ocean Township High School | Ocean, NJ

    Application: Extension of Andover Controls System in large School District. Work included removal of Pneumatic Controls and new DDC Controls for conventionally controlled equipment. HVAC Systems included Chillers, Boilers, Heat Recovery, Systems, AHU’s, Unit Ventilators, Fan Coil Units, H&V Heating Units and other miscellaneous equipment. Residents of Ocean Township passed this Energy Improvement referendum based on projected energy savings, rapid paybacks and utility grants.

  • Red Bull Stadium | Harrison, NJ

    Red Bull Stadium | Harrison, NJ

    JSC was successful in their bid to provide the BMS for the new Red Bull Soccer Arena in Harrison, NJ. With a target opening date of March 2010 it was ‘game on’ for JSC who earned the respect of Hunter Roberts Construction Group and the Red Bull Project Team. The job presented some interesting challenges as JSC had never before worked on a professional sports stadium. A technical challenge was interfacing the BACnet based Andover BMS with Aerco boilers and York Air Handler controls provided by Johnson Controls, Inc. JSC earned “ PROJECT OF THE MONTH ” by Schneider Electric. Go Red Bulls !!

 
(Click on the Projects Link for More Details)
     
  • Renewable energy technology is today’s buzz word. PVE solar, cogeneration and combined heat and power are worthy endeavors and investments….. BUT

  • First “Go Lean” - then “Go Green”...It’s easier to save energy than to produce it.

  • An HVAC Control and lighting management system designed by JSC is key to creating a Lean building
 

JSC can help with:

  • Specification writing & control system design
  • System Budgeting
  • Sizing and Selection
  • Belimo valve and actuator sales

Call or email us: 1 800 762 1815
estimating@jscbms.com

HOME | COMPANY BIO | SERVICES | PROJECTS | PORTFOLIO | CAREERS | TESTIMONIALS | NEWS | CONTACT US
Jersey State Controls 1105 Industrial Parkway Brick, NJ 08724...Ph: 800-762-1815 Fax: 732-206-0080

Logo/Website Design by Robert Cipolla Graphics